Skip to content

David Faul

Home arrow Forums
Hot Dry Rocks Discussion Forum
Welcome, Guest
Please Login or Register.    Lost Password?
Depth at which GSHP are installed (1 viewing) (1) Guest
Go to bottom Post Reply Favoured: 0
TOPIC: Depth at which GSHP are installed
#6
Liesl (User)
Fresh Boarder
Posts: 4
graph
User Offline Click here to see the profile of this user
Depth at which GSHP are installed 5 Months, 1 Week ago Karma: 0  
The deeper the system is installed, the more stable the ground temperature and therefore greater efficiency.

Horizontal systems are usually installed at a depth of 1-1.8 meters with pipes of 150-160mm diameter.Pipes need to be 0.3meters apart in the case of multiple pipes laid in a single trench and between adjacent tranches there should be a 3 meter distance. These systems are more common in rural areas where properties are larger. Trenches can be straight or curved and laid in any direction according to the site.
Generally 120-180 meters of pipe are required per ton of heat pump capacity.
Straight horizontal layout requires significant land area and is ideally laid beneath a house before building. Alternatively there is the spiral horizontal (slinky coil) which is laid in trench of only about 10m in length and can be installed in shallower depths if the soil is too hard to trench, this is appropriate for a smaller, back yard installment.

Vertical (borehole) systems are generally installed at depths of 18-60 meters where temperature are more constant throughout the year, depending on soil conditions.
Pipes of 150mm in diameter are placed in boreholes which are 5 meter apart, in the case of multiple boreholes. Usually about 80-120 meters of piping is needed for every ton (3.5KW) of heat capacity.
The piping layout must be carefully considered in order to keep a dynamic hydraulic pressure across the GSHP.
The horizontal installation requires for the site to be trenched rather than drilled and is therefore less expensive than vertical which would cost approximately $80AUD per meter drilled.
 
Report to moderator   Logged Logged  
 
Last Edit: 2008/01/23 15:24 By dfaul.
  The administrator has disabled public write access.
      Topics Author Date
    thread link
Depth at which GSHP are installed
Liesl 2008/01/23 15:19
Go to top Post Reply
Powered by FireBoardget the latest posts directly to your desktop

Login

Newsflash

Final Heat Flows are highest reported values from geothermal drilling on the electricity grid in Australia

Torrens Energy Limited announced on the 15th of May the return of the final results for Parachilna Prospect in South Australia. The final heat flows recorded from drill holes Balrog 1 and Gandalf 1 were 95 and 85mW/m2 respectively, with projected temperatures of 234°C at 5km.  The results to date define the prospect as having the highest reported heat flow values from geothermal drilling on the electricity grid in Australia. Anomalous modelled temperatures highlight the potential for a large new "geothermal field" to be established north of Port Augusta 

For more information see the asx announcement