|
|
||||
| Category Name | Upcoming Events | Total Events | ||
|
0 | 1 | ||
|
8 | 33 | ||
| There are 34 Events in 2 Categories | ||||
|
||
|
Habanero 3 Progress Update
Geodynamics Ltd on March 25th announced that open hole flow from Habanero 3, with reinjection into Habanero 1, had been proceeding since Saturday 22nd. Circulation was sustained at 20 kg/s and the temperature was 212°C at the Habanero 3 wellhead. |