|
|
|||
|
Date: Sunday, September 30, 2007 At 01:00:00 AM
|
||
|
Sparks, Nevada
|
|||
|
||
Jolokia 1 Drilling Progress On the 13th of May, Geodynamics Limited announced that the drilling of Jolokia 1 was progressing well, having reached a depth of 3,220 meters. Jolokia 1 is located ~9km from Habanero and is targeting fractured granites, that are known to be 10°C hotter than Habanero wells. |