Skip to content

Administrator

Home arrow Info
The News
Select a news topic from the list below, then select a news article to read.

Newsflash

Great news out of Paralana 2 on Wednesday Nov 4th 2009 Petratherm Ltd and JV partners Beach Petroleum and TRUenergy Geothermal announced that the “well encountered indications of permeable zones and the presence of geothermal fluids flowing into the well” at depths between 3690–3864 m. This bodes well for PTR’s plans to engineer a reservoir within the sedimentary sequence. Paralana 2 was at 3864 m and drilling ahead.
 

Login

Coming Events

There are no upcoming events currently scheduled.
View Full Calendar