| Geodynamics update for Habanero 3 |
|
|
|
| Monday, 31 March 2008 | |
|
Habanero 3 Progress Update
Geodynamics Ltd on March 25th announced that open hole flow from Habanero 3, with reinjection into Habanero 1, had been proceeding since Saturday 22nd. Circulation was sustained at 20 kg/s and the temperature was 212°C at the Habanero 3 wellhead. |
| < Prev | Next > |
|---|
|
Torrens Energy announced on Friday 21st 2007 that it was declared the runner up in “Resource Stocks” magazine’s “Best IPO of the Year” award for 2007. The accolade was in recognition of TEY’s “strong debut price, overall product and strength of performance.” |