Skip to content

Administrator

Home
Geodynamics Project Update PDF Print E-mail
Wednesday, 10 September 2008
Jolokia 1 was at 4879 m and approaching target depth of 5000 m, proving the viability of drilling geothermal wells through granite to that depth. Continuing frustrations at Habanero, however, with another pump problem stopping a second attempted circulation test after four days (target time is six weeks). The problem is with “O” rings. These are common weak points that even NASA has had trouble with in the past; nothing unique to geothermal. The supplier is working round the clock to fix the problem.
 
< Prev   Next >